H3C S7500E Switch SeriesInstallation Quick Start Hangzhou H3C Technologies Co., Ltd. http://www.h3c.com Document version: APW1
7 Figure 6 Attaching the right slide rail to the front right rack post 5. Keep the slide rail horizontal and adjust its length until the installati
8 Figure 7 Cage nut installation holes (1) Cage nuts Figure 8 Marking the cage nut installation holes 2. Install the cage nuts. 1111
9 Installing mounting brackets and cable management brackets Installing the cable management brackets on the S7506E-V The S7506E-V has two cable manag
10 Figure 10 Attaching the cable management bracket to the left mounting bracket Installing the mounting brackets Before installing the switch in th
11 • Do not hold the filler panels, filler panel handles, or the air vents of chassis to carry the chassis. Any attempt to carry the switch with thes
12 Figure 13 Grounding the switch Installing FRUs Installing a card IMPORTANT: • Before installing a card in the chassis, make sure the connector
13 Figure 14 Installing a card Installing a power module CAUTION: • Provide a circuit breaker for each power module and make sure the circuit brea
14 Figure 15 Installing a power module Connecting power cords Connecting the PSR320-A/PSR650-A power cord Figure 16 Connecting the PSR320-A/PSR650-A
15 Connecting the PSR650C-12A power cord Figure 17 Connecting the PSR650C-12A power cord Connecting the PSR1400-A power cord Figure 18 Connecting th
16 Connecting the PSR2800-ACV power cord The PSR2800-ACV is a built-in power module with AC input and DC output. It provides one system power socket a
Copyright © 2015, Hangzhou H3C Technologies Co., Ltd. and its licensors All rights reserved No part of this manual may be reproduced or transmitted
17 Figure 20 Connecting the AC power cord to the PSR6000-ACV Connecting the PSR320-D/PSR650-D/PSR650C-12D power cord Figure 21 Connecting the PSR320
18 Connecting the PSR1400-D power cord Figure 22 Connecting the PSR1400-D power cord Accessing the switch for the first time Connecting the console
19 Figure 23 Connecting the console port to a PC Setting terminal parameters To configure and manage the switch through the console port, you must r
20 Table 5 LED status when the switching is operating correctly Item Model LED Status MPU LSQM3MPUA0 LINK/ACT Steady on or flashing OK Steady on FAI
21 Item Model LED Status PoE IN2 Steady green PoE IN3 Steady green PoE OUT Steady green PoE FAN Steady green Obtaining documentation Take the fo
22 Index A C E I O S A Accessing the switch for the first time,18 C Chassis views and technical specifications,1 E Examining the installation site,5
i Contents Installation quick start ··················································································································
1 Installation quick start This installation quick start provides basic instructions for installing an S7500E switch. For more information about the i
2 Figure 2 S7503E switch front panel (1) MPU slots (2) LPU slots (3) Power module slots (4) Fan tray slot Technical specifications Table 1 Chassis
3 Model Rated voltage range Maximum output power Support for PoE Maximum PoE output power PSR320-D –48 VDC to –60 VDC 300 W No N/A PSR650-A 100 V
4 Power module Chassis S7502E S7503E-S S7503E S7506E S7506E-S S7506E (non-PoE) S7506E-V S7510E PSR1400-A — — z z z z z z PSR1400-D — — z z z z z z P
5 Figure 3 Attaching an ESD wrist strap Examining the installation site The switch can only be used indoors. To make sure the switch operates correc
6 a. Make sure the top flange of a slide rail aligns with the middle of the narrower metal area between holes in a rack post, as shown in Figure 4. b
Kommentare zu diesen Handbüchern