Cage nuts (user-supplied)
Ring terminal
(user-supplied)
Insulation sheath
(user-supplied)
ESD gloves
(user-supplied)
Checklist before installation
Table 4 Checklist before installation
Item Re
q
uirements
Result
Installation site
Weight support
The floor can support the total weight of the chassis
and all other components.
Operating ambient
temperature
0°C to 45°C (32°F to 113°F)
Operating ambient
relative humidity
5% to 95% (noncondensing)
Cleanness
Dust concentration 3 × 10
4
particles/m
3
No dust on desk within three days
Ventilation
There is a minimum clearance of 10 cm (3.94 in)
around the inlet and exhaust vents for heat
dissipation of the L1000-A chassis.
A ventilation system is available at the installation
site.
ESD prevention
The equipment and rack are well grounded.
The equipment room is dust-proof. An anti-static
floor is installed and correctly grounded.
The humidity and temperature are at a compliant
range.
Wear an ESD wrist strap and uniform when
touching a circuit board.
Place the removed power modules and interface
modules on an antistatic workbench, with the
face upward, or put it into an antistatic bag.
Touch only the edges, instead of electronic
components when observing or moving a
removed interface module.
EMI prevention
Take effective measures to protect the power
system from the power grid system.
Separate the protection ground of the L1000-A
from the grounding device or lightning protection
grounding device as far as possible.
Keep the L1000-A far away from radio stations,
radar and high-frequency devices working in
high current.
Use electromagnetic shielding when necessary.